The Eudora
WorldMail Server is a high-performance Internet and intranet mail server
that runs on Windows NT workstation and Server.
WorldMail Server is scaleable, rich in functionality, and consists of a
native SMTP/MIME message transport, a POP3/IMAP4 message store,
integrated specialized Web server, directory services (LDAP and Ph), and
comprehensive management facilities.
WorldMail Server features a graphical administration application,
WorldMail Management Center, which can be installed on multiple
computers to allow remote administration of your WorldMail Server from
various locations, even your laptop. It can also be used to manage
multiple servers remotely from a central management station.
The extensive features of WorldMail Server are built on the standards
and protocols of the Internet to provide an interoperable, open platform
for messaging.
Exchange Migration plan for moving forward:
-
Perform Due Diligence on your network via Remote Terminal Service (
Next Week)
-
Identify
existing components - users, groups, login variables
-
Document
proposed AD structure
-
Project
kickoff meeting (Friday)
-
Install
Windows Server 2003 (Friday Night)
-
Install Active Directory (Friday
Night)
-
Configure, Patch and Connect
(Friday Night)
-
Review Event Log, resolve any errors
(Friday Night)
-
Connect
AD environment to existing Windows 2000 (Friday Night)
-
Identify
existing printers (Saturday)
-
Identify
existing components in Exchange (Saturday)
-
Build
Exchange, configure, patch(Saturday)
-
Install and configure virus software,Spam
solution and Fax Software(Saturday)
-
Configure OWA in
DMZ(Saturday)
-
Verify Installation
(Saturday)
-
Perform
Mailbox Move (Saturday)
-
Install
Outlook 2003 on all desktops. (Saturday - Sunday)
-
Review
Event Log, resolve any errors (Sunday)
-
Setup
Test workstation/perform testing (Sunday)
-
On-Site
to handle any issues with the migration (Monday)
The
above steps are only an estimate of work needed to be perform a
successful migration. After we perform the Due Diligence Intercore
will have a more definite outline in MS Project to fully detail the
breadth of work needed to perform the migration . This Due
Diligence will identify issues that we can resolve before the
migration is performed.
Call us
after you have reviewed these steps with Management and are ready to
move forward to the next step.
888-603-6333 ext 89